I am going to run a new fuel line on my skyhawk with the body still on the frame. It does not look like an easy feat to run the as factory from behind drivers side outside the frame 'up and over the frame to the inside of the frame back to the gas tank.
There is only 1 joint under the frame near the engine. This is a straight line in that area and I am not sure why they split the lines there.
My questions are as follows.
1. is it ok to have multiple joints in the fuel line I am think of the place it goes up and over the frame (as described above).
2. original line is 5/16. (is it a double flair? I am perfecting my skills on short pieces as of now.
I have a brake line question also. The brake line is .190 (.187) . Is it ok to run .25 line or should I source some 3/ 16 line?
There is only 1 joint under the frame near the engine. This is a straight line in that area and I am not sure why they split the lines there.
My questions are as follows.
1. is it ok to have multiple joints in the fuel line I am think of the place it goes up and over the frame (as described above).
2. original line is 5/16. (is it a double flair? I am perfecting my skills on short pieces as of now.
I have a brake line question also. The brake line is .190 (.187) . Is it ok to run .25 line or should I source some 3/ 16 line?
Comment