Yesterday the last items when to the shipper to fill the load to New Zealand and now I can move ahead on getting rid of things and clean out the shop ect. I took time and moved the rust free 63 GT body off the pallet racks and took it out side to cut out the trunk weather strip tray both side and lower lip, then it goes onto the trailer to be filled with heavy items heads, blocks, anything that will fit and once filled off it goes to the scrapper.
here is the rail on the 55 that need the parts.
here is the rail on the 55 that need the parts.
Comment