Studebaker C/K Gas Tank Survey.
Do you have a leaky, badly dented, or missing gas tank for the dream car you are restoring?
I AM LOOKING INTO GETTING NEW TANKS MANUFACTURED FOR C/K BODIED STUDEBAKERS!
Right now I am looking into two options for a bolt-in replacement.
The least expensive one would NOT be a clone of the factory tank. To save tooling costs, they can use the bottom half of a currently manufactured tank with a slightly different profile; but the top half of the tank would be set for your Studebaker fuel inlet and sender.
The considerably more expensive route would be to completely tool for two new stampings and build tanks from there that would be clones.
I do not have a price idea at this time (but we are talking close to $30,000 to tool up for a completely new tank).
If you are probably interested at this time, send me an email at millersigns1@gmail.com with the subject line of FUEL TANK.
I will keep interested parties informed of progress. It would probably take 75 commitments to make this a happening. When I get commitments in that number, I will start working out the details.
Thank you,
Duane Miller
Do you have a leaky, badly dented, or missing gas tank for the dream car you are restoring?
I AM LOOKING INTO GETTING NEW TANKS MANUFACTURED FOR C/K BODIED STUDEBAKERS!
Right now I am looking into two options for a bolt-in replacement.
The least expensive one would NOT be a clone of the factory tank. To save tooling costs, they can use the bottom half of a currently manufactured tank with a slightly different profile; but the top half of the tank would be set for your Studebaker fuel inlet and sender.
The considerably more expensive route would be to completely tool for two new stampings and build tanks from there that would be clones.
I do not have a price idea at this time (but we are talking close to $30,000 to tool up for a completely new tank).
If you are probably interested at this time, send me an email at millersigns1@gmail.com with the subject line of FUEL TANK.
I will keep interested parties informed of progress. It would probably take 75 commitments to make this a happening. When I get commitments in that number, I will start working out the details.
Thank you,
Duane Miller
Comment