Progress,
I have my new front shocks installed. Emergency brake cables are on. Trans and engine are in place (for real this time).
Currently waiting for my bolt on yoke to the transmission so I can get a good measurement for the drive shaft. I installed all new gaskets on the engine short of the intake, They had to be ordered due to the rectangular ports. Two major hurdles left are headers and radiator.
Dean.
I have my new front shocks installed. Emergency brake cables are on. Trans and engine are in place (for real this time).
Currently waiting for my bolt on yoke to the transmission so I can get a good measurement for the drive shaft. I installed all new gaskets on the engine short of the intake, They had to be ordered due to the rectangular ports. Two major hurdles left are headers and radiator.
Dean.
Comment